NOTE: This workplan is for 2003-2007 and is under review by the PRC (State Policy Review Committee).

 

The Honourable Commissioner for Lands, Housing and Environment

Deacon Ayo Ifayefunmi

Newly constructed Ifon/Imoru road Project.
NNPC/Chevron Production terminal at Awoye in Ilaje local Govt.

 

The Governor commissioning Odosida road in Ondo, the commissioner and other guest looks on.
Construction plants and equipments of the ministries
The former Commissioner for Works, Dr. Adewole (now redeployed to Ministry of Education and Youths) delivering his welcome address during the commissioning ceremony of river Dada Bridge at Ikare Akoko.
The former Commissioner for Works, the PS Works and Transport, The Commissioner, Director of Mechanical Engineering dept. Engr. U.S. Lawal and the Managers of Samchase Nig. Ltd. during the commissioning ceremony of Ilututun/Agosobo/Iditala road.
River Dada bridge thet links Ikare Akoko with Arigidi Akoko, A major achievement of direct labour activity of the ministry of Works, Lands and Housing.
Ilututun- Ago isobo-Iditala road Project..
Oshinle Fadeyi Road Direct labour Job

 

 

 

PROGRAMMES 

1.         Restructuring of the Ministry.

2.         Preparation of Policy Documents.

3.         Construction, Rehabilitation and Maintenance of Roads

and Water ways.

4.         Routine Maintenance of Public Buildings.

5.         Strengthening the Fire Fighting Division.

6.         Resuscitation of Material Testing Laboratory.

7.         Control of Physical Development of Urban Areas.

8.         Survey and Mapping of Ondo State.

9.         Acquisition of Land for Developmental Projects.

10.       Development of Sites and Services.

11.       Capacity Building.

 
YEAR 2003

1.         Restructuring of the Ministry

            Ministry of Works and Transport and Ministry of Lands and Housing are to be merged into one Ministry comprising eight (8) Departments.

                  i.          Lands Services and Housing Department.

ii.          Survey and Mapping Department.

iii.         Civil Engineering Department.

iv          Planning, Design, Research and Transportation Department.

v          Public Buildings Department.

vi          Mechanical and Electrical Engineering and Fire

    Services Department.

vii         Urban and Regional Planning Department.

vii         Finance and Administration Department.

2.         Preparation of Policy Documents.

i.          Convene meetings of Stakeholders through workshops/seminars.

ii.          Prepare draft Policy for EXCO approval.

iii.         Publication and circulation of Policy document.

3.         Rehabilitation, Construction and Maintenance of Roads and Waterways.

 

i.    Resuscitation of the design  and field offices and setting up of an Area Engineer Office in each of the three (3) Senatorial Districts.

ii.    Redesign the scope of works of on-going road projects and renegotiate the costs.

iii.   Continuation of road works where contractors are performing.

iv.   Acquisition and refurbishment of Road Plant and Equipment.

v.            Acquisition of Design Office Equipment.

vi.           Maintenance of township and intercity roads.

vii.           Planning and designing  of roads and junction as part of            

traffic management.

4.         Routine Maintenance of Public Buildings

            i.          Rehabilitation of the Area Offices.

            ii.          Renovation of Quarters.

            iii.         Furnishing of Public Buildings.

            iv.         Furnishing of State Assembly and Residential Quarters.

v.      Landscaping and beautification of Government House Ground.

5.         Strengthening of the Fire Fighting Division

Refurbishment and acquisition of Fire Fighting Equipment and other allied accessories e.g. Foam, Chemicals, Fire Fighting Garment and breathing equipment.

6.         Resuscitation of Materials Testing Laboratory

            i.          Purchase of equipment.

ii.          Training of relevant staff in collaboration with relevant

Agencies e.g. FUTA.

7.         Control of Physical Development of Urban Areas

i.          Inspection of sites/structures to ensure compliance with Town      Planning Regulations.

ii.          Prepare reports on contravention at Akure, Owo, Ondo, Ikare, Okitipupa.

            iii.         Prepare report on River Ala and Elegbin channelisation.

            iv.         Liaise with Federal Agencies to solve the flooding at Lipakala.

8.         Survey and Mapping of Ondo State

            i.          Acquire 1:50,000 Topographical Map of Ondo State.

            ii.          Delineate/Survey of proposed Sea Port site.

            iii.         Purchase of Motorcycles for Eighteen (18) Area Offices.

            iv.         Purchase of Office Equipment.

9.         Acquisition for Land for Developmental Projects

            i.          Allocation of land and processing of title documents.

            ii.          Acquisition of Land for proposed Sea Port Area.

10.       Development of Sites and Services

            i.          Opening-up and grading of estate roads.

ii.          Construction of culverts.

            Iii         Provision of electricity to the Estates.

11.       Capacity Building.

i.          Training and retraining of professionals through seminars postgraduate  studies and workshops.

 

 

YEAR 2004

1.         Restructuring  of Ministry

i.          Completed.

2.         Preparation of Policy Documents

i.          Continues.

3.         Construction, Rehabilitation and Maintenance of Roads and Waterways

            i.          Continuation of Road works.

            ii.          Continuation of maintenance of township and inter city roads.

            iii.         Continuation of planning, designing and improvement  of road                     

                        junctions and problem spots.

iv.         Embark on development and maintenance of rural roads in collaboration with Local Government Areas.

v.         Clearing of water hyacinth.

vi.         Acquisition and refurbishing of road plant and equipment continue.

vii.        Designing of river Oluwa bridge to link Okitipupa with Iluagbo.

viii.       Liaising with the Federal Ministry of Works on the design and  construction   of Akure outer ring road.

ix.         Liaising with the Federal Government on the development of   other modes of transport.

 

4.         Routine Maintenance of Public Buildings

                        Renovation and furnishing continue.

 

5.         Strengthening of the Fire Fighting Division

i.          Maintenance of fire fighting equipment and bulk purchase of fuel and lubricants continue.

            ii.          Acquisition of allied fire fighting accessories continues.

iii.         Sinking of bore-holes in fire service stations.

 

6.         Resuscitation of Materials Testing Laboratory

i.          Continue to upgrade.

ii.          Purchase of office equipment.

 

7.         Control of Physical Development  of Urban Areas

            i.          Updating of Master-plan for Akure, Owo, Ondo, Ore.

            ii.          Preparation of Master-plan for other urban areas.

            iii.         Development control continues.

8.         Survey and Mapping of Ondo State

            i.          Cadastral Survey of existing government Layouts.

            ii.          Intra and inter-State boundary survey.

iii.         Establishment of survey control points.

iv.         Up-dating of 150,000 topographical sheets of Ondo State.

9.         Acquisition of Land for Developmental Projects

            i.          Payment of compensation.

ii.          Processing of title documents continues.

 

10.       Development of Sites and Services

            i.          Continues.

11.       Capacity Building

            i.          Continues.

 

 

YEAR 2005

1.         Restructuring of the Ministry

            i.          Completed.

 

2.         Preparation of Policy Documents

            i.          Completed.

 

3.      Construction, Rehabilitation and Maintenance of Roads and Waterways

             i.          Continuation of Road works.

            ii.          Continuation of maintenance of township and inter city roads.

iii.         Continuation of planning, designing and improvement of road junctions and problem spots.

            iv.         Embark on development and maintenance of rural roads in

                        collaboration with Local Government Areas.

v.         Clearing of water hyacinth.

vi.         Acquisition and refurbishing of road plant and equipment

continue.

vii.        Construction of river Oluwa bridge linking Okitipupa with Iluagbo to commence.

viii.       Liaising with Federal Government on the construction of Akure  outer ring road continues.

ix.         Liaising with the Federal Government on the development of other modes of transport continues.

 

4.         Routine Maintenance of Public Buildings

            Renovation and furnishing of government buildings continue.

5.         Strengthening of Fire Fighting division

            i.          Construction of additional Fire Stations.

        ii.              Maintenance of fire fighting equipment and bulk purchase of fuel and lubricants.

6.         Resuscitation of Material Testing Laboratory

            i.          Up grading continues.

            ii.          Purchase of office equipment.

7.         Control of Physical Development of Urban Areas

            i.          Urban renewal works in major urban centres continue.

            ii.          Channelisation of streams and rivers continues.

8.         Survey and Mapping of Ondo State

            i.          Purchase of survey instrument.

            ii.          Computerization and digitalization of survey records.

iii.         Establishment of survey control points continues.

iv.         Up-dating of 1:50,000 topographical sheets continues.

9.         Acquisition of Land for Development Projects

i.          Continues.

10.       Development of Sites and Services

i.          Continues.

11.       Capacity Building

i.          Continues.

 

 

YEAR 2006

1.         Restructuring of the Ministry

 

            i.          Completed.

 

2.         Preparation of Policy Documents

 

            i.          Completed.

 

3.      Construction, Rehabilitation and Maintenance of Roads and Waterways

 

            i.          Continuation of Road works.

            ii.          Continuation of maintenance of township and inter city roads.

iii.         Continuation of planning, designing and improvement of road junctions and problem spots.

            iv.         Embark on development and maintenance of rural roads in

                        collaboration with Local Government Areas.

v.         Clearing of water hyacinth continues.

vi.         Acquisition and refurbishing of road plant and equipment

            continue.

vii.        Construction of River Oluwa bridge linking Okitipupa with Ilu  Agbo continues.

viii.       Liaising with Federal Government on the construction of Akure  outer ring road continues.

ix.         Liaising with the Federal Government on the development of other modes of transport continues.

4.         Routine Maintenance of Public Buildings

             i.          Renovation and furnishing of government buildings continue.

5.         Strengthening of Fire Fighting Division

            i.          Construction of additional fire stations.

          ii.            Maintenance of fire fighting equipment and bulk purchase of fuel and lubricants continue.

6.         Resuscitation of Material Testing Laboratory.

            i.          Up grading continues.

            ii.          Purchase of office equipment continues.  

7.         Control of Physical Development of Urban Areas.

            i.          Urban Renewal works in major urban centres continue.

            ii.          Channelisation of streams and rivers continues.

8.         Survey and Mapping of Ondo State

            i.          Purchase of survey instrument continues.

            ii.          Computerization and digitalization of survey records continue.

iii.         Establishment of survey control points continues.

iv.         Up dating of 150,000 topographical sheets continues.

9.         Acquisition of Land for Developmental Projects

i.          Continues.

10.       Development of Sites and Services.

i.          Continues.

11.       Capacity Development.

i.          Continues. 

 

 

YEAR 2007

 

1.         Restructuring of the Ministry

             i.          Completed.

 2.         Preparation of Policy Documents

             i.          Completed.

 3.      Construction, Rehabilitation and maintenance of Roads and Waterways

             i.          Continuation of Road works.

            ii.          Continuation of maintenance of township and inter city roads.

iii.         Continuation of planning, designing and improvement of road junctions and problem spots.

            iv.         Embark on development and maintenance of rural roads in collaboration with Local Government Areas.

v.         Clearing of water hyacinth continues.

vi.         Acquisition and refurbishing of road Plant and Equipment continue.

vii.        Construction of River Oluwa bridge linking Okitipupa with Ilu  Agbo continues.

viii.       Liaising with Federal Government on the construction of Akure  outer ring road continues.

ix.         Liaising with the Federal Government on the development of other modes of transport continues.

4.         Routine Maintenance of Public Buildings

            i.          Renovation and furnishing of government buildings continue.

 

5.         Strengthening of Fire Fighting Division

        i.          Construction of  additional fire stations.

        ii.         Maintenance of fire fighting equipment and bulk purchase of fuel and lubricants continues.

6.         Resuscitation of Material Testing Laboratory

            i.          Up grading continues.

ii.          Purchase of office equipment continues.

7.         Control of physical Development of Urban Areas

            i.          Urban Renewal works in urban centers continue.

            ii.          Channelisation of streams and rivers continues.

8.         Survey and Mapping of Ondo State

            i.          Purchase of survey instrument continues.

            ii.          Computerization and digitalization of survey records continue.

iii.         Establishment of survey control points continues.

iv.         Up-dating of 150,000 topographical sheets continues.

9.         Acquisition of Land for Development Projects.

i.          Continues.

10.       Development of Sites and Services.

i.          Continues.

11.       Capacity Development.

i.          Continues.